|
详细内容:
|
公告公告标题:Letter of Enquiry公告内容:
Letter of Enquiry
Friday, 31 October 2025
Reference:FA00000422746
Dear Mr/Ms:
This is China Road and Bridge Corporation Glavna podružnica Zagreb Projekt spojna cesta čvor „Vučevica” na A1 & tunel Kozjak.
The Vucevica Tunnel and Connection Line Project in Croatia has a line length of 6.85km, a total contract cost of approximately 74.6 million euros, and a contract construction period of 36 months. The main project volume includes 1 long tunnel (main tunnel 2545.7m, service tunnel 2529.5m), 2 main line bridges, 4 overpasses, 1 passage, 284,000 cubic meters of roadbed filling, and 550,000 cubic meters of excavation. The implementation scope of this project includes roads, bridges, tunnels, and drainage civil construction parts, excluding traffic safety engineering, signage and marking, tunnel electromechanical, pipeline relocation and other ancillary projects.
According to the construction schedule, our project requires the purchase of Common lattice girder .
the requirements are as follows:
No.
Item Description
Model
Unit
Quantities
remarks
1
Variable lattice girder
TIP1 130/20/30 L=21.986m
set
9
2
Variable lattice girder
TIP2 130/20/30 L=22.184m
set
9
3
Variable lattice girder
TIP3 130/20/30 L= 22.385m
set
9
4
Variable lattice girder
TIP4 130/20/30 L=22.588 m
set
9
5
Variable lattice girder
TIP5 130/20/30 L= 22.793m
set
9
6
Variable lattice girder
TIP6 130/20/30 L= 23.000m
set
9
7
Variable lattice girder
TIP7 130/20/30 L=23.209 m
set
9
8
Variable lattice girder
TIP8 130/20/30 L= 23.419m
set
9
9
Variable lattice girder
TIP9 130/20/30 L= 23.642m
set
9
10
Variable lattice girder
TIP10 130/20/30 L=23.846 m
set
9
11
Variable lattice girder
TIP11 130/20/30 L= 24.062m
set
9
12
Variable lattice girder
TIP12 130/20/30 L= 24.278m
set
9
Please feel free to contact the person undersigned if you have any questions:
Name:Song Kaibing
E-mail address:song.kaibing@crbc-croatia.com
Annexures:none
We are expecting to receive your best quotation . Please attach the quotation sheet with your company qualification information(include but not limited BROAD-BASED BLACK ECONOMIC EMPOWERMENT ) and account informations.
Your prompt response will be highly appreciated.
Thanks and best regards.
附件列表 序号附件名称附件说明操作 1 Letter of Enquiry Connecting road junction Vucevicaon A1-junction on DC8 (without junction on DC8), section from 0+630.00 to 7+480.00, L=6.85km.pdf 下载 预览 验证码验证码取消确定 物资信息 序号设备物资名称设备物资说明税率单位 1 钢格栅板 GT100-20 渐变段格栅拱架,TIP1,130/20/30,L=21.986m 0% 千克 2 钢格栅板 GT100-20 渐变段格栅拱架,TIP2,130/20/30,L=22.184m 0% 千克 3 钢格栅板 GT100-20 渐变段格栅拱架,TIP3,130/20/30,L=22.385m 0% 千克 4 钢格栅板 GT100-20 渐变段格栅拱架,TIP4,130/20/30,L=22.588m 0% 千克 5 钢格栅板 GT100-20 渐变段格栅拱架,TIP5,130/20/30,L=22.793m 0% 千克 6 钢格栅板 GT100-20 渐变段格栅拱架,TIP6,130/20/30,L=23m 0% 千克 7 钢格栅板 GT100-20 渐变段格栅拱架,TIP7,130/20/30,L=23.209m 0% 千克 8 钢格栅板 GT100-20 渐变段格栅拱架,TIP8,130/20/30,L=23.419m 0% 千克 9 钢格栅板 GT100-20 渐变段格栅拱架,TIP9,130/20/30,L=23.642m 0% 千克 10 钢格栅板 GT100-20 渐变段格栅拱架,TIP10,130/20/30,L=23.846m 0% 千克 11 钢格栅板 GT100-20 渐变段格栅拱架,TIP11,130/20/30,L=24.062m 0% 千克 12 钢格栅板 GT100-20 渐变段格栅拱架,TIP12,130/20/30,L=24.278m 0% 千克 验证码验证码取消确定 列表 序号公告类型公告名称环节
|